Inspections for the day of: Monday, June 4, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-00545 PLM-Aging Inspection6/4/20016/4/20016/4/2001 12:00:00 AM PART
need additional inspection 6/4/2001 8:54:11 AM
PLM01-01780 Sprinkler (Final)6/1/20016/4/20016/4/2001 12:00:00 AMAPASS
###-####
PLM01-01766 Plumbing Rough-in6/1/20016/4/20016/4/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/01/2001 at 13:47:09. Contact: ###-####. done by inspecter 334 on 5/ 31/2001 6/4/2001 11:05:21 AM
PLM01-01793 Water and/or Sewer6/1/20016/4/20016/4/2001 12:00:00 AMAPASS
###-####
PLM01-01796 Sprinkler (Final)6/1/20016/4/20016/4/2001 12:00:00 AMAPASS
###-#### chad
PLM01-01797 Sprinkler (Final)6/1/20016/4/20016/4/2001 12:00:00 AMAPASS
chad ###-####
PLM01-01799 Sprinkler (Final)6/1/20016/4/20016/4/2001 12:00:00 AMAPART
chad ###-#### tie in ok. ok to cover will call when pvb has been certified called and talked to job foreman 6/4/2001 3:07:02 PM
PLM01-01798 Sprinkler (Final)6/1/20016/4/20016/4/2001 12:00:00 AMPPASS
chad ###-####
PLM00-04119 Plumbing Rough-in6/4/20016/4/20016/4/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/04/2001 at 09:29:37. Contact: ###-####. floor sink and hub drain for condensation in bakery job foreman told me this is the last of ground-works 6/4/2001 5:48:04 PM
PLM01-01806 Plumbing Rough-in6/4/20016/4/20016/4/2001 12:00:00 AMPPASS
###-####
PLM01-01801 Water and/or Sewer6/4/20016/4/20016/4/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 6/4/2001 1:41:29 PM inspected and witness air test on approximately 200 feet of 6-inch sewer line 6/4/2001 1:49:22 PM