BLD00-03671
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
WIP 6/5/2001 8:05:41 AM
|
BLD01-00476
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
no insps expire on 8-26 6/4/2001 10:25:37 AM
|
BLD01-00441
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
no insps expires 8-22 6/4/2001 9:03:50 AM
|
BLD01-00483
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
no insps expires on 8-26 6/4/2001 9:21:02 AM
|
BLD01-00490
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
no insps expires 8-27 6/4/2001 9:01:44 AM
|
BLD01-00400
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
no insps expires on 8-21 6/4/2001 9:10:23 AM
|
BLD01-00459
| BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | | PASS |
|
|
no insps expires on 8-25 6/4/2001 10:19:52 AM
|
MEC01-01213
| Rough-in | 5/31/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 13:36:34. Contact: ###-####
|
MEC01-01156
| Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 09:03:35. Contact: ###-####. cn posted 6/4/2001 8:51:50 AM
|
MEC01-01156
| Pressure Test | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 09:04:00. Contact: ###-####.
|
BLD01-00107
| BLD-Wall cover | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 12:21:15. Contact: ###-####. roof nailing ok 6/4/2001 10:09:56 AM
|
BLD00-03593
| BLD-Framing/Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | A | FAIL |
|
|
soffits outside of building ###-#### cn posted for draft stops 6/4/2001 1:32:54 PM
|
BLD00-02263
| BLD-Footing | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PART |
|
|
Jeff ###-#### wip 6/4/2001 2:49:59 PM
|
BLD00-03113
| BLD-Final | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | FAIL |
|
|
###-#### bob cn posted 6/4/2001 4:20:24 PM
|
BLD01-00693
| BLD-Framing/Rough-in | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-03593
| BLD-Framing/Rough-in | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 408 On 6/4/2001 11:18:19 AM wip draft stop ok 6/4/2001 3:33:46 PM
|
BLD01-00793
| BLD-Conference | 6/4/2001 | 6/4/2001 | 6/4/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 408 On 6/4/2001 4:20:09 PM
|