BLD02-00494
| BLD-Final | 6/3/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | A | NR |
|
|
DUANE ###-#### pending other insp. for final before bld final can be performed. 6/7/2002 5:26:03 PM
|
BLD02-01214
| BLD-Footing | 6/3/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 11:38:09. Contact: ###-####.
|
BLD01-02401
| BLD-Final | 6/3/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | A | PASS |
|
|
###-#### final ok 6/4/2002 10:33:29 AM
|
BLD02-00004
| BLD-Final | 6/3/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | A | PASS |
|
|
don ###-#### fn -re-insp
|
BLD02-01000
| BLD-Framing/Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | A | PASS |
|
|
DEAN ###-#### ok to cover all but gas test on fire place / 6/4/2002 11:11:26 AM
|
BLD01-02479
| BLD-Final | 6/4/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | A | PASS |
|
|
final ok
|
BLD02-00844
| BLD-Energy code compliance | 6/4/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 10:20:00. Contact: ###-####.insulation ok. 6/4/2002 3:13:16 PM
|
BLD02-00321
| BLD-Framing/Rough-in | 6/4/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | P | PART |
|
|
###-#### JUSTIN missing itp plates on two trusses front of garage.lable trussess. 6/4/2002 4:15:45 PM
|
BLD01-00516
| BLD-Energy code compliance | 6/4/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 08:03:22. Contact: ###-####. insulation in attic above old house must be covered . check at final. 6/4/2002 2:56:06 PM
|
BLD01-00942
| BLD-Framing/Rough-in | 6/4/2002 | 6/4/2002 | 6/4/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 09:31:16. Contact: . membrane penatrations in ceilling. center tower. 6/4/2002 2:38:07 PM
|