Inspections for the day of: Tuesday, June 4, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00494 BLD-Final6/3/20026/4/20026/4/2002 12:00:00 AMANR
DUANE ###-#### pending other insp. for final before bld final can be performed. 6/7/2002 5:26:03 PM
BLD02-01214 BLD-Footing6/3/20026/4/20026/4/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/03/2002 at 11:38:09. Contact: ###-####.
BLD01-02401 BLD-Final6/3/20026/4/20026/4/2002 12:00:00 AMAPASS
###-#### final ok 6/4/2002 10:33:29 AM
BLD02-00004 BLD-Final6/3/20026/4/20026/4/2002 12:00:00 AMAPASS
don ###-#### fn -re-insp
BLD02-01000 BLD-Framing/Rough-in6/3/20026/4/20026/4/2002 12:00:00 AMAPASS
DEAN ###-#### ok to cover all but gas test on fire place / 6/4/2002 11:11:26 AM
BLD01-02479 BLD-Final6/4/20026/4/20026/4/2002 12:00:00 AMAPASS
final ok
BLD02-00844 BLD-Energy code compliance6/4/20026/4/20026/4/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/04/2002 at 10:20:00. Contact: ###-####.insulation ok. 6/4/2002 3:13:16 PM
BLD02-00321 BLD-Framing/Rough-in6/4/20026/4/20026/4/2002 12:00:00 AMPPART
###-#### JUSTIN missing itp plates on two trusses front of garage.lable trussess. 6/4/2002 4:15:45 PM
BLD01-00516 BLD-Energy code compliance6/4/20026/4/20026/4/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/04/2002 at 08:03:22. Contact: ###-####. insulation in attic above old house must be covered . check at final. 6/4/2002 2:56:06 PM
BLD01-00942 BLD-Framing/Rough-in6/4/20026/4/20026/4/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/04/2002 at 09:31:16. Contact: . membrane penatrations in ceilling. center tower. 6/4/2002 2:38:07 PM