ESC03-01029
| BMP Violation | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | A | PART |
|
|
Informed rp to post stormwater sign at job site. 6/4/2004 11:38:10 AM
|
ESC03-01028
| BMP Violation | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | A | PART |
|
|
Informed rp to post sign at job site. Sweep daily or as needed. 6/4/2004 11:38:40 AM
|
ESC04-00581
| Site Preparation | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | P | PART |
|
|
Need signage. Informed rp. 6/4/2004 1:42:44 PM
|
ESC04-00465
| Site Preparation | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | P | PART |
|
|
Need signage. Informed rp 6/4/2004 1:43:18 PM
|
ESC03-01613
| BMP Violation | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | P | FAIL |
|
|
Issued correction notice on site. Post sign, remove mud trackout, install gravel in mud hole to prevent further trackout, left of driveway. Informed RP via voice mail of the pending correction notice. Will follow up. 6/4/2004 1:41:56 PM
|
ESC04-00332
| BMP Violation | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | P | PART |
|
|
Correction to rp--post sign, clean curb and sidewalk. 6/4/2004 3:34:19 PM
|