BLD04-01211
| BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | | PASS |
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
BLD04-00543
| BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | | PASS |
|
|
Footing subgrade approved by geotechnical engineer provided 3 inches of loose material is removed.
|
BLD02-01026
| BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | | PASS |
|
|
Final grading and drainage approved.
|
BLD02-02103
| BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | | PASS |
|
|
Footing subgrade approved by geotechnical engineer
|
BLD02-02436
| BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 12:00:00 AM | | PASS |
|
|
Footing subgrade approved by the geotechnical engineer
|