FIR06-00958
| INSP-Sprinkler Rough-in/Hydro | 6/1/2007 | 6/4/2007 | 6/5/2007 11:50:09 AM | A | PASS |
|
|
Above ground hydro test passed for central building.
|
FIR07-00385
| INSP-Final Inspection | 6/1/2007 | 6/4/2007 | 6/5/2007 7:43:18 AM | P | PASS |
|
|
permit finaled
|
FIR07-00368
| INSP-Final Inspection | 6/1/2007 | 6/4/2007 | 6/4/2007 3:13:22 PM | A | PASS |
|
|
Permit finaled
|
BLD07-00027
| FIRE-Final Inspection | 6/1/2007 | 6/4/2007 | 6/4/2007 3:12:30 PM | A | FAIL |
|
|
Provide current inspection tag for the fire extinguishers and remove the manual bolts from the two new doors and remove the thumbturn from the new main exit
|
FIR07-00379
| INSP-Final Inspection | 6/1/2007 | 6/4/2007 | 6/4/2007 11:17:22 AM | A | PASS |
|
|
permit finaled
|