ESC06-01699
| Site Final | 6/4/2009 | 6/4/2009 | 6/5/2009 8:55:57 AM | P | PASS |
|
|
|
ESC09-00307
| Site Preparation | 6/4/2009 | 6/4/2009 | 6/4/2009 3:45:44 PM | P | PASS |
|
|
|
BLD09-00849
| BLD-Footing | 6/4/2009 | 6/4/2009 | 6/4/2009 3:44:22 PM | P | PASS |
|
|
dave Phone #: ###-#### Foot and wall OK
|
BLD07-02083
| BLD-Wall cover | 6/3/2009 | 6/4/2009 | 6/4/2009 2:57:30 PM | P | PASS |
|
|
sheet rock nailing in hallways on all three floors. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD09-00276
| BLD-Energy code compliance | 6/3/2009 | 6/4/2009 | 6/4/2009 2:56:06 PM | A | PASS |
|
|
Ray Phone #: ###-####
|
BLD09-00542
| BLD-Footing | 6/3/2009 | 6/4/2009 | 6/4/2009 11:01:14 AM | A | PASS |
|
|
Footing for 4ply girder OK per Engineering.
|