FIR05-00698
| INSP-Final Inspection | 6/3/2009 | 6/4/2009 | 6/5/2009 5:28:16 PM | P | FAIL |
|
|
Building walkthrough completed for scope of fire alarm permit work, noted several areas on plans in need of adjustment, repair, provision or modification. Some items such as elevator recall are not ready for testing. Missing relays for mag locks at two main entry doors, MP stations at the west open area are not yet installed, plans need to reflect field installation including actual number of nac panels/circuts, added sprinkler monitor points at floor control manifolds, new relays, added devices etc. See stamped drawings for red-lined annotations.
|
FIR05-00750
| INSP-Final Inspection | 6/3/2009 | 6/4/2009 | 6/4/2009 3:11:39 PM | P | NR |
|
|
Pending FIR05-00698 completion.
|
FIR09-00255
| INSP-Sprinkler Rough-in | 6/4/2009 | 6/4/2009 | 6/4/2009 3:07:39 PM | P | PART |
|
|
UG fire supply line hydrostatic retest passed.
|
FIR09-00256
| INSP-Sprinkler Rough-in | 6/4/2009 | 6/4/2009 | 6/4/2009 3:07:08 PM | P | PART |
|
|
UG fire supply line hydrostatic retest passed.
|
FIR09-00249
| INSP-Sprinkler Rough-in | 6/4/2009 | 6/4/2009 | 6/4/2009 3:06:40 PM | P | PART |
|
|
UG fire supply line hydrostatic retest passed.
|
BLD09-00851
| FIRE-Final Inspection | 6/3/2009 | 6/4/2009 | 6/4/2009 3:05:44 PM | P | PASS |
|
|
Life safety is acceptable pending approved door hardware at the second exit or remove non-required exit sign at this location- to be verified for completion prior to structural final signature as discussed.
|
FIR09-00248
| INSP-Sprinkler Rough-in | 6/4/2009 | 6/4/2009 | 6/4/2009 1:00:12 PM | A | PART |
|
|
See approved plans for 1st and 2nd floors okayed for cover in building J units 510 and 512.
|