ELE09-00694
| Permanent Service | 6/4/2009 | 6/4/2009 | 6/4/2009 4:09:12 PM | P | PASS |
|
|
This inspection is for all 3 p/s. Rey is contact. Thank you and have a wonderful day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw p/s u/g n ok note correction NEC310.4(A)(B)(1)thru(5) a proper load bank test on these services shall be completed prior to final sign off.
|
ELE09-00925
| Electrical Rough-In | 6/4/2009 | 6/4/2009 | 6/4/2009 3:38:50 PM | P | PASS |
|
|
Jim is the onsite contact, his no. is ###-####. Thank You. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok cover ri
|
ELE09-00941
| Electrical Rough-In | 6/3/2009 | 6/4/2009 | 6/4/2009 12:03:07 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 6/3/2009 at 4:34:39 PM. Contact: ###-####. wrong type inspection
|
ELE09-00941
| Final | 6/4/2009 | 6/4/2009 | 6/4/2009 12:02:34 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/3/2009 at 4:34:39 PM. Contact: ###-####. ok final
|