Inspections for the day of: Friday, June 4, 2010.
Number of inspections: 6
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00423 Site Preparation6/1/20106/1/2010   
BLD10-00599 BLD-Energy code compliance6/4/20106/4/20106/4/2010 5:35:49 PMPPASS
rod - please call for access Phone #: ###-####
BLD09-00323 BLD-Conference6/4/20106/4/20106/4/2010 4:05:53 PMPDONE
Travis Phone #: ###-####
Met with Travis....I told him again that the Architect of record needs to re-design the entire West side of Bldg. at exterior for landings, ramps, sidewalks and handrails. Architect to submit drawings to PDS dept. for approval.
ESC10-00245 Site Final6/3/20106/4/20106/4/2010 3:01:45 PMAFAIL
complete landscaping.
ESC10-00241 Site Final6/3/20106/4/20106/4/2010 2:41:46 PMAFAIL
Complete landscaping.
ESC10-00239 Site Final6/3/20106/4/20106/4/2010 10:32:16 AMAFAIL
Complete landscaping.....