MIS12-00039
| MEC-Conference | 5/31/2012 | 6/4/2012 | 6/4/2012 4:56:15 PM | P | PEND |
|
|
Brian Phone #: ###-####...called and left a message...no return call
|
MEC11-03718
| Final | 6/4/2012 | 6/4/2012 | 6/4/2012 4:54:37 PM | P | PASS |
|
|
Tim ###-####
|
MEC11-02730
| Final | 6/4/2012 | 6/4/2012 | 6/4/2012 4:54:19 PM | P | PASS |
|
|
nile ###-####
|
MEC12-01731
| Pressure Test | 6/1/2012 | 6/4/2012 | 6/4/2012 4:53:37 PM | P | PASS |
|
|
ED Phone #: ###-####....20lb u/g to bbq ok
|
GCM12-00089
| GCM-Pellet or Wood Stove | 6/4/2012 | 6/4/2012 | 6/4/2012 3:36:15 PM | P | NR |
|
|
gas fireplace....jennifer ###-####...framer unable to remove sheeting above f/p until tues am...i rescheduled for then
|
MEC11-02681
| DOC - Permit Expired | 6/4/2012 | 6/4/2012 | 6/4/2012 3:34:10 PM | P | PASS |
|
|
the home owner will not return calls for access to inspect the job
|
MEC12-01559
| Rough-in | 6/4/2012 | 6/4/2012 | 6/4/2012 3:33:54 PM | P | NR |
|
|
MIke Phone #: ###-####....no man j on site..didn't know he needed to schedule a duct blast test
|
ESC12-00004
| Site Final | 6/4/2012 | 6/4/2012 | 6/4/2012 3:33:12 PM | P | PASS |
|
|
will drive by and check on job
|
MEC12-01614
| Rough-in | 6/4/2012 | 6/4/2012 | 6/4/2012 3:32:54 PM | P | PART |
|
|
oleg ###-####...duct blaster ok...equipment doesn't match manual j...gas failed
|
MIS12-00143
| MEC-Final | 6/1/2012 | 6/4/2012 | 6/4/2012 2:29:28 PM | A | PASS |
|
|
david Phone #: ###-####....I had them remove one piece of equipment from under the type 1 hood..all exhaust, make-up air and fan in working order
|
GCM12-00070
| GCM-Final | 6/1/2012 | 6/4/2012 | 6/4/2012 12:03:02 PM | A | PASS |
|
|
Mark @ ###-####...final chill and heating pipe tie-ins at river end of motel ok
|
ESC12-00541
| Site Preparation | 6/4/2012 | 6/4/2012 | 6/4/2012 11:29:21 AM | | PEND |
|
|
work not started yet
|
GCM12-00089
| GCM-Pressure Test | 6/1/2012 | 6/4/2012 | 6/4/2012 11:20:43 AM | A | PASS |
|
|
Jenifer @ ###-#### AM inspection requested. first thing....20lb gas ok
|
MEC11-02366
| Mec-Aging Inspection | 6/4/2012 | 6/4/2012 | 6/4/2012 11:10:51 AM | | PASS |
|
|
he is still working on the job
|
MEC12-01614
| Rough-in | 6/1/2012 | 6/4/2012 | 6/4/2012 11:07:30 AM | A | NR |
|
|
Oleg Phone #: ###-####....duct blaster hasn't been scheduled per Rex ###-####
|
ESC12-00237
| General Inspection | 6/4/2012 | 6/4/2012 | 6/4/2012 10:21:21 AM | A | PASS |
|
|
job site clean
|
MEC12-01279
| Final | 6/1/2012 | 6/4/2012 | 6/4/2012 10:19:49 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
GCM12-00058
| GCM-Pressure Test | 6/1/2012 | 6/4/2012 | 6/4/2012 9:56:04 AM | A | PASS |
|
|
Brandon @ ###-#### ...60lb gas to all equipment drops...all regs will be on roof...all flues on w/h ok
|