Inspections for the day of: Monday, June 4, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00469 INSP-Final Inspection6/4/20126/4/20126/4/2012 3:54:28 PMPPASS
permit finaled
FIR12-00247 INSP-Sprinkler Rough-in6/1/20126/4/20126/4/2012 3:46:04 PMPPASS
See the city approved plans for the locations at four buildings where a partial approval has been given to cover the underground supply piping. Locations are marked in red with approximate pipe lengths.
BLD12-00860 FIRE-Sprinkler Rough-in6/4/20126/4/20126/4/2012 3:20:17 PMPPASS
Sprinkler piping is ok to cover. I also went over life safety requirements with the job superintendant. One new exit sign was found to be nonfunctional and the suite number is missing.
BLD12-01006 FIRE-Final Inspection6/4/20126/4/20126/4/2012 3:15:57 PMPFAIL
Inspection was actually for a conference. I met Jim Sly at the project site as well as the insulator contractor and discussed what jim and I would be looking for on our inspections. This included sprinkler obstructions. Work is being started in the Windmill book store.
FIR12-00250 INSP-Final Inspection6/4/20126/4/20126/4/2012 3:12:46 PMPPASS
permit finaled
BLD12-01204 FIRE-Final Inspection6/1/20126/4/20126/4/2012 11:19:01 AMPCANC
Josh Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
BLD11-02817 FIRE-Final Inspection6/1/20126/4/20126/4/2012 11:06:55 AMAPASS
Life safety passed.
BLD12-00440 FIRE-Final Inspection6/1/20126/4/20126/4/2012 10:02:30 AMAPASS
life safety passed. Contractor is going to remove the thumbturn deadbolts prior to the building inspection.