ESC12-00194
| Site Preparation | 6/4/2012 | 6/4/2012 | 6/8/2012 11:25:42 AM | | PART |
|
|
Discussed with the RP on what requirements are needed to stay compliant with the permit conditions and the federal requirements as well. They will begin the project on 6/11/2012. A Site preparation inspection will be conducted on 6/12/2012.
|
ESC11-00771
| General Inspection | 6/4/2012 | 6/4/2012 | 6/7/2012 7:16:06 AM | | FAIL |
|
|
Refer to ESC11-00348 for inspection report.
|
ESC12-00023
| General Inspection | 6/4/2012 | 6/4/2012 | 6/5/2012 7:55:28 AM | | PART |
|
|
Temporoary stabilization methods are working correctly. Cannot close permit until the time that they establish perminate stabilization measures.
|
ESC12-00343
| BMP Violation | 6/1/2012 | 6/4/2012 | 6/5/2012 7:50:40 AM | A | FAIL |
|
|
Correction Notice: Provide protection for the storm drain inlet infront of the project area. Failure to comply with the notice will result in further enforcement. Wil re-inspect on 6/6/2012AM.
|
ESC11-00415
| General Inspection | 6/4/2012 | 6/4/2012 | 6/4/2012 12:58:22 PM | | PASS |
|
|
|