Inspections for the day of: Tuesday, June 4, 2013.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00296 FIR-Aging Inspection6/4/20136/4/20136/5/2013 9:02:19 AM NR
I spoke to Rick Phone #: ###-#### with Public Works, and he said different options are being investigated for a solution.
FIR13-00171 INSP-Sprinkler Rough-in/Hydro6/4/20136/4/20136/4/2013 3:19:57 PMPPASS
Hydro test and sprinkler rough-in passed. As-builts have been provided.
BLD12-03289 FIRE-Final Inspection6/4/20136/4/20136/4/2013 3:14:53 PMPFAIL
Provide floor plan that matches, provide single action hardware on the main exit and if the dead bolt is to remain it shall be keyed on the inside, and provide annual inspection for the fire extinguisher.
BLD13-00303 FIRE-Final Inspection6/3/20136/4/20136/4/2013 2:49:54 PMPFAIL
Mike did not have the approved plans/notes on site for this permit so I performed an inspection for BLD13-01062 which was not scheduled.
FIR12-00286 INSP-Final Inspection5/30/20136/4/20136/4/2013 11:34:26 AMAFAIL
Need to perform the forward flush and perform a depth, flush and hydro inspection on the underground supply as per discussion. Also need to verify the flow switch function/interconnection with the facp.
FIR13-00132 INSP-Final Inspection6/4/20136/4/20136/4/2013 11:06:18 AMPPASS
Permit finaled
BLD11-00519 FIRE-Final Inspection5/30/20136/4/20136/4/2013 10:39:45 AMAFAIL
The project related fire sprinkler permit needs to be addressed which includes all aspects of the underground supply piping to the fire sprinkler system. Also no city approved plans/notes were on site for an inspection.
FIR13-00020 INSP-Sprinkler Rough-in6/3/20136/4/20136/4/2013 10:05:27 AMAPASS
Tenting inspection is passed at 2030. Sprinkler piping can be covered.