Inspections for the day of: Tuesday, June 4, 2013.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-01487 BLD-Conference6/4/20136/4/20136/4/2013 3:52:38 PMPDONE
On site to check on job progress. Noted that lube center is erected and shop expansion is nearly 3/4 erected. Also noted that no inspections were scheduled. Did note that all work has been inspected by special inspection. Noted to contractor that he is still required to schedule inspections with the building dept. While on site walk through lube expansion and observed grout placement on shop expansion from 12ft to 16ft. elevation. Also reviewed all special inspection reports to date.
BLD13-00849 BLD-Wall Bracing6/4/20136/4/20136/4/2013 2:25:11 PMPCANC
The site is located on the first floor near the Cheesecake Factory entrance area. I pass the escalator and head toward the center stairs area. The Barricade has a big logo AVEDA Phone #: ###-#### >> Inspection requested via web by Jonathan Pearson
BLD13-00849 BLD-Conference6/4/20136/4/20136/4/2013 2:25:01 PMPDONE
The site is located on the first floor near the Cheesecake Factory entrance area. I pass the escalator and head toward the center stairs area. The Barricade has a big logo AVEDA Phone #: ###-#### >> Inspection requested via web by Jonathan Pearson. Discussion pertaining to additional wall braces on tenant seperation walls per detail on approved plans. Noted to contractor due to sesmic requirements, kickers may not be required, but would need an RFI from engineer to delete them.
BLD13-00438 BLD-Framing/Rough-in6/3/20136/4/20136/4/2013 10:32:27 AMAPASS
Marco Phone #: ###-####. Steel stud framing for new exterior facade, west enterance.
BLD12-02492 BLD-Framing/Rough-in6/3/20136/4/20136/4/2013 10:09:45 AMAFAIL
nabi Phone #: ###-####. Needs to reapir structure as per approved plans.