ESC13-00193
| BMP Violation | 6/4/2013 | 6/4/2013 | 6/4/2013 9:54:11 AM | A | FAIL |
|
|
Written Correction notice and voicemail left: 1. signage needs to be moved to construction access; it is currently located at top of hill on unpermitted lot. 2. Distrubed lot to south needs permitted or restored to pre-existing condition. This disturbed lot has the potential to contribute signifiant turbid run-on. 3. The silt fence is not installed where the plan shows it. Install silt fence along the top of the slope on the west side.
|
ESC13-00339
| Conference | 6/3/2013 | 6/4/2013 | 6/4/2013 12:00:00 AM | A | DONE |
|
|
Pre-construction meeting with Matt (Applicant) and Steve Walker (RP) held on site with KMJ.
|
ESC13-00339
| Site Preparation | 6/4/2013 | 6/4/2013 | 6/4/2013 12:00:00 AM | P | PASS |
|
|
SWO lifted
|