Inspections for the day of: Wednesday, June 4, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00859 DOC - Permit Finaled6/4/20146/4/20146/4/2014 4:14:24 PMPPASS
ESC13-00859 Aging Inspection6/4/20146/4/20146/4/2014 3:46:38 PM CANC
Old house has been demolished and a new house constructed. House is complete with all permits finaled. This was for the demo. ESC conditions satisfied.
ESC14-00286 General Inspection6/4/20146/4/20146/4/2014 3:28:38 PM PASS
Finaled.
ESC14-00286 DOC - Permit Finaled6/4/20146/4/20146/4/2014 3:28:25 PMPPASS
Power pole installed and power cable trench covered. Temp BMP (DI bag) has been removed. ESC conditions satisfied.
ESC14-00429 General Inspection6/4/20146/4/20146/4/2014 3:06:27 PM PASS
Wattles installed below area where rock wall was placed. No trackout to Woodcross. The ESC permit for whole house ESC13-01035 is also in compliance.
ESC14-00440 Site Preparation6/4/20146/4/20146/4/2014 2:58:26 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards

Permit posted. Mill District Square BMPs installed and no violations on existing Brighton projects. Approved for construction.
ESC14-00425 General Inspection6/4/20146/4/20146/4/2014 2:38:30 PM PASS
Lot has been grubbed and stockpiles removed. Looks like it is being prepared for development. Has not been stabilized but will wait to see what the plans for lot are. Currently no dust or migrating sediment issues.
ESC13-01263 Conference6/4/20146/4/20146/4/2014 2:35:01 PMPPASS
CM Company called to inform about plans regarding the unstabilized berm that was constructed. BK does not have the funds to landscape at this time. CM has hired a subcontractor to put down a temporary tacifier and mulch to stabize the berm to prevent dust issues. This is to be complete Monday June 9. Will check next week.