ELE17-03778
| Final | 6/4/2018 | 6/4/2018 | 6/4/2018 2:17:47 PM | P | PART |
|
|
ceiling partial final for sales floor Phone #: ###-#### Inspection requested via web by Shane Lott partial final Isle 1 to S. side of building only ok
|
ELE18-01756
| Rough-In Permanent Service | 6/4/2018 | 6/4/2018 | 6/4/2018 1:48:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Corrections made rough in ok p/s u/g n ok
|
ELE18-02081
| Electrical Rough-In | 6/4/2018 | 6/4/2018 | 6/4/2018 1:22:07 PM | P | PASS |
|
|
Soffit inspection Phone #: ###-#### Inspection requested via web by Ben Archibald Soffits only ok to cover
|
ELE18-02054
| Rough-In Permanent Service | 6/4/2018 | 6/4/2018 | 6/4/2018 1:05:38 PM | P | PASS |
|
|
door should be unlocked. or key is on top of back door jamb Phone #: ###-#### Inspection requested via web by Paula Gratiot rough in ok p/s o/h n ok
|
ELE18-02068
| Final | 6/1/2018 | 6/4/2018 | 6/4/2018 12:47:18 PM | A | PASS |
|
|
PLEASE CONTACT HOMEOWNER FOR ACCESS @ ###-#### Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON Final ok
|
ELE18-01902
| Final | 6/1/2018 | 6/4/2018 | 6/4/2018 11:52:55 AM | A | PASS |
|
|
The power is on and the pump is running and the home on on the lot has sold and occupied nice folks very chatty Phone #: ###-#### Inspection requested via web by Thomas wilson Final ok
|
ELE18-02069
| Electrical Rough-In | 6/1/2018 | 6/4/2018 | 6/4/2018 11:52:34 AM | A | PASS |
|
|
Ceiling and underground inspection, as per Pierre. Phone #: ###-#### Inspection requested via web by Tom Betty Hard lid phase 1 only. Access points needed for all J boxes. I have pictures and locations. Hard lid only ok
|
ELE18-01775
| Electrical Rough-In | 6/4/2018 | 6/4/2018 | 6/4/2018 11:14:26 AM | P | PASS |
|
|
Partial underground and bonding for swimming pool Phone #: ###-#### Inspection requested via web by Lars Johnson Corner stubs, Hand rail and cover bond ok. PVC stub from light UG ok
|
ELE18-00494
| Final | 6/4/2018 | 6/4/2018 | 6/4/2018 11:05:43 AM | A | PASS |
|
|
CODE 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn final ok
|
ELE18-01908
| Rough-In Permanent Service | 6/1/2018 | 6/4/2018 | 6/4/2018 11:00:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn rough in ok p/s u/g n ok
|
ELE18-00916
| Final | 6/1/2018 | 6/4/2018 | 6/4/2018 10:21:22 AM | A | PASS |
|
|
garage code 4124 Phone #: ###-#### Inspection requested via web by Darryn Coburn corrections made final ok
|
ELE18-00915
| Final | 6/1/2018 | 6/4/2018 | 6/4/2018 10:20:53 AM | A | PASS |
|
|
garage code 4024 Phone #: ###-#### Inspection requested via web by Darryn Coburn corrections made final ok
|
ELE18-02056
| Electrical Rough-In | 6/2/2018 | 6/4/2018 | 6/4/2018 10:00:24 AM | A | PASS |
|
|
One wall with 2 receptacles r/I. Off parkcenter behind Barbacoa restaurant Please call when arriving and i''ll meet you Phone #: ###-#### Inspection requested via web by Rex Boyles Conference room wall only Switch and exit sign cut in. rough in ok
|
ELE18-01095
| Electrical Rough-In | 6/1/2018 | 6/4/2018 | 6/4/2018 9:17:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jamie berg rough in ok
|