Inspections for the day of: Thursday, June 4, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-01868 Final6/3/20206/4/20206/4/2020 1:54:37 PMPPASS
Please call Aric on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks...
power fed off existing circuit for ignitor...ok to final
MIS20-00186 ELE-Conference6/4/20206/4/20206/4/2020 1:07:25 PMPDONE
building without permit // Brandy Phone #: ###-####

notice given...no evidence of work being done from outside
ELE19-04821 Final6/4/20206/4/20206/4/2020 12:16:41 PMPPASS
Construction manager on site for access Phone #: ###-#### Inspection requested via web by David Seilheimer...complete...ok to final
ELE20-01899 Rough-In Permanent Service6/3/20206/4/20206/4/2020 11:51:46 AMPPASS
call first ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER...
exterior panel added with new underground feed...grounding brought up to code and 2 junction boxes above new panel
p/s u/g reconnect to new location ok
ELE20-01898 Rough-In Permanent Service6/3/20206/4/20206/4/2020 11:44:28 AMPPASS
call first ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER...
all-in-one mounted outside...ok to cover pipe and grounding up to code...final inspection verify sub feed to existing subpanel
p/s u/g reconnect to new location ok
ELE20-01816 Final6/2/20206/4/20206/4/2020 11:13:21 AMPPASS
Please call the homeowner when on way: Lisa ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks...new location with new disconnect ok
ELE20-01644 Final6/4/20206/4/20206/4/2020 10:39:38 AMPPASS
Chad Vanorden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...corrections made..ok to final
ELE20-01891 Electrical Rough-In6/3/20206/4/20206/4/2020 10:29:38 AMAPASS
Please call or text me when heading that way so I can meet and unlock the building. Phone #: ###-#### Inspection requested via web by Adnan Nuhanovic...
rough ok to cover...walls and hard lids
discussed conference rm floor receptacle
ELE20-01891 Permanent Service6/4/20206/4/20206/4/2020 10:22:23 AMAPASS
Please call or text me when heading that way so I can meet and unlock the building. Phone #: ###-#### Inspection requested via web by Adnan Nuhanovic...
p/s u/g new ok
ELE20-01820 Final6/3/20206/4/20206/4/2020 10:06:59 AMAPASS
Job is complete and was already inspected. . need final to close permit. Phone #: ###-#### Inspection requested via web by Clint Keely...meter installed...required for final...ok to final
ELE19-00223 Final6/3/20206/4/20206/4/2020 9:21:49 AMPFAIL
Phone #: ###-#### x125 Inspection requested via web by Steve VanWinkle...

1) in ground junction box-proper wire nuts need used...110.3 rated exterior material
ELE19-01264 Final6/3/20206/4/20206/4/2020 9:05:23 AMPPASS
Phone #: ###-#### x125 Inspection requested via web by Steve VanWinkle...complete...visible disconnect...label interior...ok to final
ELE20-01444 Final6/3/20206/4/20206/4/2020 8:53:47 AMAPASS
Phone #: ###-#### Inspection requested via web by Taras Shulga...correction made...ok to final
ELE19-04348 Electrical Rough-In6/3/20206/4/20206/4/2020 8:22:26 AMAPASS
pole bases (2) Phone #: ###-#### Inspection requested via web by Todd Hall..
parking lot pole bases ok to pour
ELE20-01652 Electrical Rough-In6/3/20206/4/20206/3/2020 3:16:54 PMAPASS
Shawn *screened* Phone #: ###-####

viewed by images per time constraints..ok to cover
ELE20-01652 Electrical Rough-In6/3/20206/4/20206/3/2020 3:16:00 PMAPASS
screened - uffer // Shawn Phone #: ###-####

viewed by images per time constraints..ok to cover