PLM96-01528
| INSP - Sewer and Water lines | 6/4/1996 | 6/5/1996 | 6/6/1996 12:00:00 AM | A | CANC |
|
|
?
|
PLM96-01530
| INSP - Sprinkler & Backflow | 6/4/1996 | 6/5/1996 | 6/5/1996 12:00:00 AM | A | PASS |
|
|
06/05/96 347 - REINSPECTION SP. O/K 6/5/6 347
|
PLM96-01016
| INSP - Plumbing Rough-in | 6/4/1996 | 6/5/1996 | 6/5/1996 12:00:00 AM | A | PASS |
|
|
06/05/96 347 - w/c 2 basin 2 tub 1 shr 1 sink 1 w/b 1 l/t 1 w/h 1 f/d w trap primer r/[ o/k 6/5/6 347
|
PLM96-01350
| INSP - Sewer and Water lines | 6/5/1996 | 6/5/1996 | 6/5/1996 12:00:00 AM | P | PART |
|
|
06/05/96 347 - SEWER ONLY. sewer o/k interceptor o/k accept vent 6/5/6 347
|
PLM96-01533
| INSP - Plumbing Rough-in | 6/5/1996 | 6/5/1996 | 6/5/1996 12:00:00 AM | P | PASS |
|
|
06/05/96 347 - 2 WC, 2 LAVS, 1 TUB/SH, 1 SH, 1 KITCH SNK,1 WATER HTR, 1 CLOTHES/DRYER. ACTUAL COUNT W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 R/I O/K 6/5/6 347
|
PLM96-01534
| INSP - Plumbing Rough-in | 6/5/1996 | 6/5/1996 | 6/5/1996 12:00:00 AM | P | PASS |
|
|
06/05/96 347 - 2 W/C 2 LAV 2 TUB/SHOWER 1 SINK 1 W/H 1 W/B AND 2 LAUNDRY CORRECT COUNT W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 R/I O/K 6/5/6 347
|
PLM96-01535
| INSP - Sprinkler & Backflow | 6/5/1996 | 6/5/1996 | 6/5/1996 12:00:00 AM | P | PASS |
|
|
06/05/96 347 - SP. O/K 6/5/6 347
|
PLM96-01539
| INSP - Sprinkler & Backflow | 6/5/1996 | 6/5/1996 | 6/5/1996 12:00:00 AM | P | PASS |
|
|
06/05/96 347 - sp. O/K 6/5/6 347
|
PLM96-01527
| INSP - Plumbing Rough-in | 6/4/1996 | 6/5/1996 | 6/4/1996 12:00:00 AM | P | PASS |
|
|
INSTALL HANDI-CAP TOILET, WASH BASIN AND BAR SINK. RE-LOCATE WATER HEATER AND INSTALL NEW ONE UPSTAIR-BLD95-0399-$1,895.00 NEEDS 3:00 INSPECTION
|