BLD00-03711
| BLD-Framing/Rough-in | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PART |
|
|
Framing OK...Zone 2.....C/N for E.I.F.S. Install and rating. 6/5/2001 9:47:53 AM
|
MEC01-01137
| Final | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 07:50:36. Contact: ###-####.
|
BLD00-01531
| BLD-Framing/Rough-in | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | FAIL |
|
|
Val Taylor ###-#### Need all trade finals. 6/5/2001 12:37:36 PM
|
BLD01-01323
| BLD-Footing | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-01265
| BLD-Footing | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
wes ###-####
|
BLD00-02887
| BLD-Final | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | CANC |
|
|
###-#### PJ Smith called in said to cancel inspection.
|
BLD01-01247
| BLD-Foundation | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01249
| BLD-Foundation | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01261
| BLD-Foundation | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
Mana ###-####
|
BLD01-01294
| BLD-Foundation | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01307
| BLD-Foundation | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 10:39:14. Contact: ###-####.
|
BLD01-00043
| BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PART |
|
|
shear wall chuck ###-#### C/N....Retro HD.... nailing OK 6/5/2001 2:48:49 PM
|
BLD01-01130
| BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PART |
|
|
chuck ###-#### shear wall Shear OK 6/5/2001 3:57:41 PM
|
BLD01-01412
| BLD-Footing | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
jerry ###-####
|
BLD01-00760
| BLD-Final | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
###-#### JP FN C/C issued. 6/5/2001 4:48:00 PM
|