ELE01-00977
| Electrical Rough-In | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 12:01:43. Contact: ###-####. conf with contractor 6/5/2001 12:46:49 PM
|
ELE01-01824
| Temporary Service | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
gary ###-#### t/s u/g n ok 6/5/2001 12:46:21 PM
|
ELE01-00553
| Final | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
ED ###-#### ok final 6/5/2001 11:40:18 AM
|
ELE01-01715
| Rough-In Permanent Service | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 15:55:19. Contact: ###-####. p/s u/g n ok - ok cover ri 6/5/2001 11:21:36 AM
|
ELE01-00136
| Final | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | FAIL |
|
|
###-#### reinspection corrections BCC all wires shall be term. into box NEC 210-52(a)(1) 6/5/2001 10:49:50 AM
|
ELE01-01825
| Temporary Service | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | FAIL |
|
|
###-#### gary no ground rod front panal door will not open 6/5/2001 12:56:02 PM
|
ELE01-01764
| Electrical Rough-In | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
Linda ###-#### p/s u/g n ok - ok cover ri 6/5/2001 1:14:50 PM
|
ELE01-00395
| Final | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
###-#### ok final 6/5/2001 2:52:49 PM
|