MEC01-01589
| Rough-in | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 11:43:12. Contact: ###-####.
|
BLD01-00102
| BLD-Final | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
###-#### code 4444 enter c.c #20352 issued 6/5/2001 9:01:57 AM
|
BLD01-00103
| BLD-Final | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
4444 enter garage code ###-#### c.c #20353 issued 6/5/2001 9:02:34 AM
|
BLD00-02817
| BLD-Framing/Rough-in | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | NR |
|
|
###-####
|
MIS01-00101
| BLD-Final | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
PAGE ANDY ###-#### TO MEET THERE 6/5/2001 10:28:44 AM
|
BLD00-02631
| BLD-Footing | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PART |
|
|
BRYAN ###-#### mti will check rebar befor concrete placement 6/5/2001 11:10:39 AM
|
BLD00-02632
| BLD-Foundation | 6/4/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PART |
|
|
###-#### 6/5/2001 11:08:50 AM mti will check masonry bar befor pour 6/5/2001 11:09:45 AM
|
BLD00-02769
| BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 6/5/2001 11:45:59 AM shear panels contractor has letter from engineer for alternate shear panels using sheet rock on inter walls
|
BLD01-01299
| BLD-Footing | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | CANC |
|
|
Jack ###-#### 6/5/2001 1:48:28 PM 6/5/2001 3:32:54 PM
|
BLD01-00625
| BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PART |
|
|
call first ###-#### c/n same as 5892 ok to insulate 6/5/2001 3:42:39 PM
|
BLD01-00626
| BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PART |
|
|
###-#### c/n on site from 6/4 still need to correct several items ok to insulate 6/5/2001 3:42:57 PM
|
BLD01-00536
| BLD-Final | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 10:51:30. Contact: ###-####.
|
BLD01-00592
| BLD-Energy code compliance | 6/5/2001 | 6/5/2001 | 6/5/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 10:52:40. Contact: ###-####.
|