BLD01-03228
| BLD-Wall cover | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 10:48:09. Contact: ###-####.reports justifing iuses signed off by engineer of record. 6/5/2002 9:48:30 AM
|
BLD02-01008
| BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 15:26:57. Contact: ###-####. framing ok 6/5/2002 10:17:58 AM
|
BLD02-01326
| BLD-Footing | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PART |
|
|
JOHN ###-#### wip set backs ok 6/5/2002 10:46:58 AM
|
MEC02-00971
| Final | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PASS |
|
|
###-#### key above front door c/n made ok final ok 6/5/2002 9:01:47 AM
|
BLD01-03229
| BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PASS |
|
|
walls ok for cover.
|
BLD01-00942
| BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PASS |
|
|
###-#### fire stopping ok drops ok for cover. 6/5/2002 2:57:06 PM
|
BLD02-00166
| BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PASS |
|
|
###-#### JIM
|
BLD01-03112
| BLD-Final | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PART |
|
|
###-#### pete temp. final ok pending sign off from others/ final affidavit from special inspection ok an in archive. 6/5/2002 5:02:56 PM
|
BLD02-00389
| BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | FAIL |
|
|
1. need all sealants applied to top plates and sole plates be for framing insp.
2. holddowns for interior wall at back of kitchen for engineered sheer pannel need info.
3. need hanger at garage water heater header.
|
BLD02-00167
| BLD-Final | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PASS |
|
|
###-#### key above front door final ok c/n made ok 6/5/2002 9:01:28 AM
|