BLD02-00643
| BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PART |
|
|
partial wall- gil- ###-####--on 9th fl addition walls ok, verify sprinklers. 6/5/2002 10:23:41 AM
|
BLD02-00720
| BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PART |
|
|
block wall- darrin ###-#### ...pend spec insp report 6/5/2002 2:28:24 PM
|
BLD01-03156
| BLD-Final | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | NR |
|
|
awaiting eifs report 6/5/2002 10:34:05 AM
|
BLD01-02415
| BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 06:35:47. Contact: ###-####...grid, complete wires as reqd 6/5/2002 2:28:01 PM
|
BLD02-00720
| BLD-Concrete | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PART |
|
|
strata onsite 6/5/2002 5:40:12 PM
|
BLD01-02415
| BLD-Conference | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PASS |
|
|
re elec insp at grid. Schmer ok'd grid for cover 6/5/2002 5:40:34 PM
|
BLD02-00333
| BLD-Final | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PASS |
|
|
Cathy has the card...ok for c/o 6/5/2002 2:32:52 PM
|
BLD01-00594
| BLD-Final | 6/3/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | NR |
|
|
###-####
|
BLD01-00603
| BLD-Final | 6/3/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | NR |
|
|
###-####
|
BLD01-00595
| BLD-Final | 6/3/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | NR |
|
|
###-####
|
BLD01-00596
| BLD-Final | 6/3/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | NR |
|
|
###-####
|