BLD01-00729
| BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PART |
|
|
CLAY ###-####
|
BLD02-01127
| BLD-Final | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 15:35:27. Contact: ###-####.. posted c/n no plans on site. 6/5/2002 1:11:04 PM
|
BLD02-01222
| BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 17:51:12. Contact: ###-####.
|
BLD01-02802
| BLD-Final | 6/3/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 10:04:52. Contact: ###-####. walk thru only ,needs all signatures on card will need to 6/5/2002 12:53:37 PM o recall. 6/5/2002 12:53:43 PM 6/5/2002 12:53:54 PM
|
BLD02-01309
| BLD-Footing | 6/3/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PART |
|
|
###-#### JOHN wip. 6/5/2002 4:21:05 PM
|
BLD02-00503
| BLD-Final | 6/4/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PASS |
|
|
###-####2 RON. Ok temp oc. 6/6/2002 10:03:00 AM
|
BLD01-02798
| BLD-Final | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | FAIL |
|
|
###-#### jeff door hdw, special insp letter of completion, handrail, all signatures on card went over this with cont. 6/5/2002 3:35:48 PM
|
BLD02-01222
| BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 6/5/2002 11:17:09 AM . ok to drywall, need to patch ele in ten dimising walls. 6/5/2002 3:46:19 PM
|
BLD02-00418
| BLD-Conference | 6/5/2002 | 6/5/2002 | 6/5/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 407 On 6/5/2002 1:27:11 PM Contractor wanted to know what they needed to do to get a final, told him the same items apply as told to other person phoning this in,get all required signatures prior to calling for a final , Note I see no record of a framing inspection on this. 6/5/2002 1:32:26 PM
|