Inspections for the day of: Wednesday, June 5, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00729 BLD-Framing/Rough-in6/4/20026/5/20026/5/2002 12:00:00 AMAPART
CLAY ###-####
BLD02-01127 BLD-Final6/4/20026/5/20026/5/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/04/2002 at 15:35:27. Contact: ###-####.. posted c/n no plans on site. 6/5/2002 1:11:04 PM
BLD02-01222 BLD-Framing/Rough-in6/4/20026/5/20026/5/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 06/04/2002 at 17:51:12. Contact: ###-####.
BLD01-02802 BLD-Final6/3/20026/5/20026/5/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/03/2002 at 10:04:52. Contact: ###-####. walk thru only ,needs all signatures on card will need to 6/5/2002 12:53:37 PM o recall. 6/5/2002 12:53:43 PM 6/5/2002 12:53:54 PM
BLD02-01309 BLD-Footing6/3/20026/5/20026/5/2002 12:00:00 AMPPART
###-#### JOHN wip. 6/5/2002 4:21:05 PM
BLD02-00503 BLD-Final6/4/20026/5/20026/5/2002 12:00:00 AMPPASS
###-####2 RON. Ok temp oc. 6/6/2002 10:03:00 AM
BLD01-02798 BLD-Final6/5/20026/5/20026/5/2002 12:00:00 AMPFAIL
###-#### jeff door hdw, special insp letter of completion, handrail, all signatures on card went over this with cont. 6/5/2002 3:35:48 PM
BLD02-01222 BLD-Framing/Rough-in6/5/20026/5/20026/5/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 6/5/2002 11:17:09 AM . ok to drywall, need to patch ele in ten dimising walls. 6/5/2002 3:46:19 PM
BLD02-00418 BLD-Conference6/5/20026/5/20026/5/2002 12:00:00 AMPNR
Scheduled by Inspector: 407 On 6/5/2002 1:27:11 PM Contractor wanted to know what they needed to do to get a final, told him the same items apply as told to other person phoning this in,get all required signatures prior to calling for a final , Note I see no record of a framing inspection on this. 6/5/2002 1:32:26 PM