PLM03-01549
| Plumbing Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/4/2003 at 4:04:12 PM. Contact: ###-####. ri ok 6/5/2003 8:49:19 AM
|
PLM03-01602
| Plumbing Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 7:45:57 AM. Contact: ###-####. in walls 6/5/2003 2:45:13 PM
|
PLM03-01584
| Plumbing Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 8:16:09 AM. Contact: ###-####. ri ok 6/5/2003 3:57:36 PM
|
PLM03-01635
| Plumbing Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PASS |
|
|
###-#### nancy ri ok 6/5/2003 4:14:00 PM
|
PLM03-00782
| Final | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 10:56:24 AM. Contact: ###-####. final ok 6/5/2003 3:14:41 PM
|
PLM03-00495
| Groundwork | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 11:13:50 AM. Contact: ###-####.
|
PLM03-00210
| Sprinkler (Final) | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PASS |
|
|
sp final ok 6/5/2003 3:43:11 PM
|
PLM03-00495
| Final | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | FAIL |
|
|
needs a water heater pan, provide information on the tub and shower valves that are installed showing they are thermostatic or pressure balance, the valves that were installed at the ri are on the garage floor
|