BLD03-00356
| BLD-Aging Inspection | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | | DONE |
|
|
sign...issued 90 days 6/5/2003 9:27:28 AM
|
BLD03-00405
| BLD-Aging Inspection | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | | DONE |
|
|
roof, expires 9-03 6/5/2003 9:29:41 AM
|
BLD02-00370
| BLD-Framing/Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | A | PART |
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD02-00370
| BLD-Framing/Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | A | CANC |
|
|
Randy
|
BLD03-01228
| BLD-Conference | 6/4/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | A | PASS |
|
|
w/ Pat Lass re SWO & electric w/i bldg..."R" occ.? 6/5/2003 8:22:03 AM
|
BLD03-00814
| BLD-Conference | 6/4/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PASS |
|
|
Don, w/ clg framer re cisca rules 6/5/2003 1:43:44 PM
|
BLD03-00742
| BLD-Framing/Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/4/2003 at 1:40:49 PM. Contact: ###-####....ok to cover int walls pend plbg....discussed rails w/ bldr. 6/5/2003 3:03:10 PM
|
BLD02-02911
| BLD-Energy code compliance | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Gary Gettman...walls ok 6/5/2003 5:18:25 PM
|
BLD02-02379
| BLD-Final | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | NR |
|
|
late p.m. if possible- after MEC inspection. Thanks; Phone #: ###-#### Internet Inspection Request from: Gary Gettman...need hvac 4:55P, no insp performed 6/5/2003 5:18:05 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PART |
|
|
4hr wall wip ok...add therma fiber batts per detail...GA file wp2964, show photo at 4th fl. 6/5/2003 4:20:54 PM
|
BLD02-00369
| BLD-Conference | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PASS |
|
|
w/ arch, framer, drywaller, & gen contractor....need listings for pipe pens at deck, install firestopping/blocking, clarify allowable offsets for simpson thru bolt hold downs (1 3/4" max?) at detailed wall offsets (C units, ext.)...wip ok to continue.. 6/5/2003 4:16:15 PM...ok to pre install 1 side rock at court shafts. .. 6/5/2003 4:19:26 PM
|
BLD03-00284
| BLD-Framing/Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | NH |
|
|
russ seal package; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, 6/5/2003 5:06:55 PM, calle 6/5/2003 5:07:18 PM house locked. 6/5/2003 5:07:45 PM
|
BLD03-01046
| BLD-Foundation | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PART |
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wall ok 6/5/2003 4:38:54 PM
|
BLD03-00830
| BLD-Conference | 6/5/2003 | 6/5/2003 | 6/5/2003 12:00:00 AM | P | PASS |
|
|
w/ Riley Mahaffey & John Price re proposed struct change...referred to Westfall... 6/5/2003 3:07:14 PM
|