FIR08-00077
| INSP-Sprinkler Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 5:35:13 PM | A | PART |
|
|
The lateral earthquake bracing is overspaced. The branchline piping sizing below the mezzanine does not match the approved drawings. This area is a remote area. Resubmitt plans showing the pipe size revisions and revised hydraulic calculations.
|
BLD07-00143
| FIRE-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 5:33:01 PM | A | CANC |
|
|
Duplicate inspection.
|
BLD07-00143
| FIRE-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 5:31:50 PM | A | PART |
|
|
A temporary occupancy was given with Mark Sentenno's permission until the existing school has been demo'd and the new door hardware has been verified.
|
FIR08-00193
| INSP-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 5:29:46 PM | A | PASS |
|
|
Permit finaled
|
BLD07-02067
| FIRE-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 11:44:50 AM | A | PASS |
|
|
fire life saftey passed
|
FIR07-00909
| INSP-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 11:18:45 AM | A | PASS |
|
|
permit finaled
|
FIR08-00311
| INSP-Final Inspection | 6/5/2008 | 6/5/2008 | 6/5/2008 10:38:31 AM | A | PASS |
|
|
Permit finaled
|
FIR07-00874
| INSP-Sprinkler Rough-in/Hydro | 6/4/2008 | 6/5/2008 | 6/5/2008 10:27:52 AM | A | PART |
|
|
The 24 hour air tests have been started for the Aid Station with 42psi on the guage and the Dining Area with 47psi on the guage. Test started at 9:00am
|
BLD05-01603
| FIRE-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 10:26:26 AM | A | PASS |
|
|
life safety passed
|
FIR07-00999
| INSP-Alarm Testing | 6/4/2008 | 6/5/2008 | 6/5/2008 8:55:01 AM | A | PASS |
|
|
Permit finaled
|