ESC08-00232
| General Inspection | 6/5/2008 | 6/5/2008 | 6/5/2008 3:48:13 PM | P | PASS |
|
|
sign posted. bmps ok.
|
BLD08-00616
| BLD-Footing | 6/5/2008 | 6/5/2008 | 6/5/2008 3:47:52 PM | P | PASS |
|
|
Matt- call prior to going Phone #: ###-####
|
BLD07-00870
| BLD-Final | 6/3/2008 | 6/5/2008 | 6/5/2008 3:47:27 PM | P | PASS |
|
|
Scott Phone #: ###-####
|
BLD07-00870
| DOC - Permit Finaled | 6/5/2008 | 6/5/2008 | 6/5/2008 3:47:22 PM | P | PASS |
|
|
|
ESC07-00428
| Site Final | 6/5/2008 | 6/5/2008 | 6/5/2008 3:47:14 PM | P | PASS |
|
|
bmps removed, no debries 70% revegitation achieved.
|
ESC07-01007
| Random Inspection | 6/5/2008 | 6/5/2008 | 6/5/2008 3:46:11 PM | P | PASS |
|
|
Sign posted, bmps ok. parking lot complete.
|
BLD07-02123
| BLD-Wall cover | 6/5/2008 | 6/5/2008 | 6/5/2008 3:45:24 PM | P | PART |
|
|
Ben Phone #: ###-####. 2nd layer of 2hr. wall at attic only.
|
BLD08-00103
| BLD-Framing/Rough-in | 6/5/2008 | 6/5/2008 | 6/5/2008 1:15:02 PM | P | PASS |
|
|
Charlie Phone #: ###-####furout walls in new pizzaria and soffitt at pharmacy.
|
BLD08-00306
| BLD-Framing/Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 11:21:45 AM | A | FAIL |
|
|
dave Phone #: ###-####. Complete airseal package, finish lateral bracing, complete fireblocking on furout and concealed spaces, winder stairs not same distance at 12 inch walk line.
|
ESC08-00112
| BMP Violation | 6/5/2008 | 6/5/2008 | 6/5/2008 11:13:04 AM | A | PASS |
|
|
All issues were resolved. Bmps ok.
|
BLD08-00651
| BLD-Final | 6/4/2008 | 6/5/2008 | 6/5/2008 10:12:43 AM | A | NR |
|
|
scott - late morning please Phone #: ###-####. Still needs life/safety final.
|
ESC08-00164
| Random Inspection | 6/5/2008 | 6/5/2008 | 6/5/2008 10:08:41 AM | A | PASS |
|
|
Sign posted, bmps ok.
|
BLD08-00443
| BLD-Energy code compliance | 6/4/2008 | 6/5/2008 | 6/5/2008 10:08:06 AM | A | PASS |
|
|
carl Phone #: ###-####. Straps were added, ok for cover.
|
BLD08-00103
| BLD-Framing/Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 9:56:31 AM | A | NR |
|
|
bob\\this is for a soffit inspection Phone #: ###-####. no one on jobsite, trailer locked. Noted to bob on phone that he would have to reschedule for this afternoon or when someone would be here.
|
BLD08-00724
| BLD-Framing/Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 9:39:37 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/4/2008 at 4:41:18 PM. Contact: ###-####.
|
BLD07-03132
| BLD-Concrete | 6/4/2008 | 6/5/2008 | 6/5/2008 9:18:26 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/4/2008 at 4:27:22 PM. Contact: ###-####. Reinforcement for concrete tilt panels #7-12 and#19-21. ok.
|