BLD09-00728
| FIRE-Final Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 5:16:33 PM | P | PASS |
|
|
Fire life safety is acceptable, PFE to be attatched to the wall as discussed, post max. occupant load sign prior to structural final as agreed, inspection passed.
|
BLD09-00455
| FIRE-Conference | 6/5/2009 | 6/5/2009 | 6/5/2009 5:13:35 PM | A | DONE |
|
|
Regarding project completion dates and phasing.
|
BLD07-01910
| FIRE-Final Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 5:12:30 PM | A | NR |
|
|
Contact Russ on site
|
BLD09-00776
| FIRE-Final Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 12:43:41 PM | A | NR |
|
|
Contact Phil ###-####
|
BLD08-02150
| FIRE-Final Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 12:42:10 PM | P | PASS |
|
|
Items on correction notice verified for completion, fire life safety inspection passed. NOTE: No signature card available on site, notified contractor.
|
BLD08-01126
| FIRE-Final Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 12:31:14 PM | A | PASS |
|
|
Fire life safety approved for final.
|