Inspections for the day of: Wednesday, June 5, 2013.
Number of inspections: 6
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-02367 FIRE-Final Inspection5/29/20135/30/2013 A 
Contact on site, or Dave at ###-####
FIR13-00214 INSP-Sprinkler Rough-in6/4/20136/5/20136/6/2013 10:18:33 PMPPART
UG fire supply line to a point 100' from the stem wall okayed for bury as marked on approved plans (90 ell not included).
BLD13-01310 FIRE-Final Inspection6/3/20136/5/20136/5/2013 1:06:41 PMAPASS
Fire life safety okay pending EM light at the stairway to the second level is repaired, door hardware at the patient area to be configured as discussed.
FIR13-00202 INSP-Final Inspection6/4/20136/5/20136/5/2013 1:03:55 PMAPASS
Hood suppression system operated correctly under test conditions. Inspection passed, permit finaled.
BLD13-01335 FIRE-Final Inspection6/4/20136/5/20136/5/2013 1:00:59 PMAPASS
Life safety okay pending new address numbers are posted, junction box is covered at the back storage room. Division between the storage and mercantile areas is not yet provided.
BLD13-01258 FIRE-Final Inspection6/3/20136/5/20136/5/2013 12:56:17 PMAPASS
Previous correction items verified for completion. Fire life safety passed.