BLD12-01487
| BLD-Other | 6/5/2013 | 6/5/2013 | 6/5/2013 4:39:08 PM | P | PART |
|
|
masonary grout//Mike Phone #: ###-####. Work in progress, 16ft. to 20ft. elevation for shop expansion. Special inspector on site.
|
BLD13-01053
| BLD-Final | 6/5/2013 | 6/5/2013 | 6/5/2013 4:18:43 PM | P | NR |
|
|
dan please call before going out Phone #: ###-####
|
BLD13-01312
| BLD-Final | 6/5/2013 | 6/5/2013 | 6/5/2013 4:09:49 PM | P | PASS |
|
|
Crystal please call before going out Phone #: 368-. ok for perm occ.
|
BLD13-00975
| BLD-Framing/Rough-in | 6/4/2013 | 6/5/2013 | 6/5/2013 3:21:17 PM | P | PASS |
|
|
Grant Phone #: ###-####
|
BLD13-00669
| BLD-Final | 6/5/2013 | 6/5/2013 | 6/5/2013 3:20:30 PM | P | NR |
|
|
Eric Phone #: ###-####. Needs electrical and plumbing finals first.
|
BLD12-00688
| BLD-Footing | 6/5/2013 | 6/5/2013 | 6/5/2013 2:25:54 PM | P | PASS |
|
|
footing inspection after 2pm please Phone #: ###-#### >> Inspection requested via web by Fred Depold
|
BLD12-01487
| BLD-Other | 6/4/2013 | 6/5/2013 | 6/5/2013 2:20:29 PM | A | CANC |
|
|
MOved to PM
|
GCB12-00154
| GCB-Final | 6/4/2013 | 6/5/2013 | 6/5/2013 1:47:09 PM | P | FAIL |
|
|
Dan Phone #: ###-####. Provide blower door test results and post or the 3rd party airseal inspection report. Provide the approved energy cert and post. Remove roof vent from 4ft. laydown parapet and repair. Correction notice posted.
|
GCB13-00062
| GCB-Fndatn/slab ins/fld vent | 6/5/2013 | 6/5/2013 | 6/5/2013 1:16:29 PM | P | DONE |
|
|
Tim ###-####. this stemwall has allready been placed, floor framing in progress.
|
BLD12-00679
| BLD-Final | 6/4/2013 | 6/5/2013 | 6/5/2013 10:57:59 AM | A | FAIL |
|
|
>> Inspection requested via web by Fred Depold. Complete all fire stopping on membrane penetrations.
|
ESC13-00274
| Random Inspection | 6/5/2013 | 6/5/2013 | 6/5/2013 10:56:39 AM | A | PASS |
|
|
|
BLD13-00563
| BLD-Footing | 6/4/2013 | 6/5/2013 | 6/5/2013 10:56:19 AM | A | PASS |
|
|
greg Phone #: ###-####
|
ESC13-00239
| Random Inspection | 6/5/2013 | 6/5/2013 | 6/5/2013 10:55:28 AM | A | PASS |
|
|
|
BLD13-00553
| BLD-Footing | 6/4/2013 | 6/5/2013 | 6/5/2013 10:55:07 AM | A | PASS |
|
|
greg Phone #: ###-####
|
ESC13-00231
| Random Inspection | 6/5/2013 | 6/5/2013 | 6/5/2013 10:54:13 AM | A | PASS |
|
|
|
BLD13-00555
| BLD-Footing | 6/4/2013 | 6/5/2013 | 6/5/2013 10:53:45 AM | A | PASS |
|
|
greg Phone #: ###-####
|
ESC13-00241
| Random Inspection | 6/5/2013 | 6/5/2013 | 6/5/2013 10:52:44 AM | A | PASS |
|
|
|
BLD13-00549
| BLD-Footing | 6/4/2013 | 6/5/2013 | 6/5/2013 9:37:50 AM | A | PASS |
|
|
greg Phone #: ###-####. Interior thickend footings.
|
BLD12-00679
| BLD-Final | 6/4/2013 | 6/5/2013 | 6/4/2013 3:57:01 PM | A | CANC |
|
|
bring cerveza on ice please Phone #: ###-#### >> Inspection requested via web by Fred Depold Inspection cancelled from web by: Fred Depold
|