FIR14-00309
| INSP-Final Inspection | 6/5/2014 | 6/5/2014 | 6/5/2014 4:40:02 PM | P | PASS |
|
|
Scope of work completed and passed functional testing and inspection. Permit finaled.
|
FIR14-00310
| INSP-Final Inspection | 6/5/2014 | 6/5/2014 | 6/5/2014 4:39:11 PM | P | FAIL |
|
|
Insufficient netcon rating.
|
BLD13-02788
| FIRE-Final Inspection | 6/5/2014 | 6/5/2014 | 6/5/2014 4:37:41 PM | P | PASS |
|
|
Panic hardware at the south exit doors is satisfactory. The north pair of exit doors still needs to have the manual thumbturn removed and provided with keyed locking hardware per IBC conditions- to be verified by structural inspector for compliance prior to final as discussed.
|
BLD14-00949
| FIRE-Final Inspection | 6/5/2014 | 6/5/2014 | 6/5/2014 4:33:43 PM | P | PART |
|
|
"Phase one" area fire life safety inspection completed acceptable.
|
BLD13-03008
| FIRE-Final Inspection | 6/4/2014 | 6/5/2014 | 6/5/2014 3:01:44 PM | A | PASS |
|
|
Fire life safety passed.
|
FIR14-00264
| INSP-Final Inspection | 6/3/2014 | 6/5/2014 | 6/5/2014 11:14:02 AM | A | PART |
|
|
"Phase one" at the NW quadrant passed overhead rough-in inspection.
|
FIR14-00234
| INSP-Final Inspection | 6/3/2014 | 6/5/2014 | 6/5/2014 11:12:35 AM | A | PASS |
|
|
Rough-in and final inspections completed and passed. Permit finaled.
|
FIR14-00254
| INSP-Alarm Testing | 6/3/2014 | 6/5/2014 | 6/5/2014 11:11:39 AM | A | PART |
|
|
Phase one area at the NW corner passed fire alarm testing and inspection per the scope of work indicated.
|
FIR14-00255
| INSP-Alarm Testing | 6/2/2014 | 6/5/2014 | 6/5/2014 11:09:51 AM | A | PASS |
|
|
Fire alarm work passed functional testing.
|
FIR14-00217
| INSP-Sprinkler Rough-in | 6/4/2014 | 6/5/2014 | 6/5/2014 11:08:29 AM | A | PART |
|
|
Okay to cover fire sprinkler work at the sheetrock ceilings and soffits as marked on approved plans in the meeting room areas 2nd floor east side.
|