BLD06-00450
| BLD-Aging Inspection | 6/5/2015 | 6/5/2015 | 6/5/2015 4:19:27 PM | | PEND |
|
|
|
BLD14-03622
| BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 4:19:08 PM | A | PEND |
|
|
Phone #: ###-#### Inspection requested via web by Chris Eby ok to insulate needs to fire block fur out wall fix header over double door kitchen
|
BLD15-00296
| BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 4:16:53 PM | P | PASS |
|
|
Framing inspection for stairways and first floor except front lobby Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD13-03405
| BLD-Wall cover | 6/5/2015 | 6/5/2015 | 6/5/2015 4:16:07 PM | P | PASS |
|
|
5th floor Tower 4 corridor soffit Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD15-01879
| BLD-Conference | 6/5/2015 | 6/5/2015 | 6/5/2015 4:14:56 PM | P | PASS |
|
|
As late as possible Phone #: 2082865655 >> Inspection requested via mobile web by ray teeter
|
BLD15-00498
| BLD-Foundation | 6/5/2015 | 6/5/2015 | 6/5/2015 4:14:36 PM | P | PART |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron basement walls ok
|
BLD15-00392
| BLD-Energy code compliance | 6/5/2015 | 6/5/2015 | 6/5/2015 3:12:19 PM | P | PASS |
|
|
|
BLD15-01098
| BLD-Framing/Rough-in | 6/5/2015 | 6/5/2015 | 6/5/2015 1:36:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Michael Kuhn
|
BLD15-00830
| BLD-Footing | 6/5/2015 | 6/5/2015 | 6/5/2015 1:35:17 PM | P | NR |
|
|
Bruce-would like at 10 AM Phone #: ###-####
|
BLD15-00814
| BLD-Foundation | 6/4/2015 | 6/5/2015 | 6/5/2015 11:57:34 AM | A | PART |
|
|
Advardo Phone #: ###-#### east 3rd ok
|
BLD15-00846
| DOC - Permit Finaled | 6/5/2015 | 6/5/2015 | 6/5/2015 11:56:51 AM | P | PASS |
|
|
|
BLD13-03405
| BLD-Wall cover | 6/4/2015 | 6/5/2015 | 6/5/2015 11:55:38 AM | A | NR |
|
|
Tower 4 soffits and fire caulk at 2 hour wall Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD15-00376
| BLD-Ceiling Grid Inspection | 6/4/2015 | 6/5/2015 | 6/5/2015 9:38:43 AM | A | PASS |
|
|
Tim Phone #: ###-####
|
BLD15-01421
| BLD-Energy code compliance | 6/4/2015 | 6/5/2015 | 6/5/2015 9:29:41 AM | A | PASS |
|
|
Kevin Phone #: ###-####
|
BLD15-00392
| BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 9:21:27 AM | A | PASS |
|
|
Dan-call prior to meet Phone #: ###-####
|
BLD15-00391
| BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 9:11:23 AM | A | PASS |
|
|
This is the final item - the outside foundation fix - has been done! Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD15-01201
| BLD-Wall Bracing | 6/4/2015 | 6/5/2015 | 6/5/2015 9:04:32 AM | A | FAIL |
|
|
Plans are in mailbox on west side. Phone #: ###-#### Inspection requested via web by Andrew George needs floor to floor strapes restaple at 3 and 6 get new shear calcs se corner installed larger window cut shear panel down to less than 1/4
|