BLD15-00128
| BLD-Foundation | 6/4/2015 | 6/5/2015 | 6/5/2015 3:40:30 PM | P | DEFR |
|
|
CMU 1:00PM pour; Tony Phone #: ###-####
|
BLD15-00485
| BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 3:31:47 PM | P | NR |
|
|
Steve Phone #: ###-####
|
BLD15-01747
| BLD-Framing/Rough-in | 6/5/2015 | 6/5/2015 | 6/5/2015 3:17:45 PM | P | PASS |
|
|
Bill-call for access Phone #: ###-####
|
BLD15-01235
| BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 2:59:39 PM | P | PART |
|
|
Lance Phone #: ###-####. ok pending elec. rough in inspection.
|
BLD14-03379
| BLD-Wall Bracing | 6/5/2015 | 6/5/2015 | 6/5/2015 2:18:10 PM | P | PASS |
|
|
Drywall shear connections Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03318
| BLD-Conference | 6/4/2015 | 6/5/2015 | 6/5/2015 2:05:14 PM | P | DONE |
|
|
Need to review items from previous inspection. 10 minutes max, Thanks Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD13-03308
| BLD-Final | 6/5/2015 | 6/5/2015 | 6/5/2015 1:48:28 PM | P | NR |
|
|
Bill Phone #: ###-####. Needs fire/life/safety final.
|
BLD15-00884
| BLD-Final | 6/5/2015 | 6/5/2015 | 6/5/2015 1:46:00 PM | P | PASS |
|
|
call James prior to going out Phone #: ###-####
|
BLD15-00884
| DOC - Permit Finaled | 6/5/2015 | 6/5/2015 | 6/5/2015 1:43:55 PM | P | PASS |
|
|
|
BLD15-01037
| BLD-Footing | 6/4/2015 | 6/5/2015 | 6/5/2015 11:27:44 AM | A | CANC |
|
|
Dane Phone #: ###-####
|
BLD15-01037
| BLD-Footing | 6/4/2015 | 6/5/2015 | 6/5/2015 11:26:41 AM | A | NR |
|
|
Dane Phone #: ###-####
|
BLD15-00841
| BLD-Energy code compliance | 6/4/2015 | 6/5/2015 | 6/5/2015 11:25:33 AM | A | PASS |
|
|
And reframing. // Colby Phone #: ###-####
|
BLD15-00841
| BLD-Framing/Rough-in | 6/5/2015 | 6/5/2015 | 6/5/2015 11:25:09 AM | A | PASS |
|
|
And reframing. // Colby Phone #: ###-####
|
BLD15-01437
| BLD-Wall Bracing | 6/4/2015 | 6/5/2015 | 6/5/2015 11:00:34 AM | A | FAIL |
|
|
shear//Zemima Phone #: ###-####. Provide approved fix for modified trusses, A2 and gable end truss bearing at incorrect locations, provide additional brackets for treat 2x4 bearing studs above and below. Correction notice issued.
|
BLD15-01101
| BLD-Energy code compliance | 6/2/2015 | 6/5/2015 | 6/5/2015 10:33:04 AM | A | PASS |
|
|
Bill Phone #: ###-####
|
BLD14-02369
| BLD-Foundation | 6/4/2015 | 6/5/2015 | 6/5/2015 10:23:41 AM | A | PASS |
|
|
Manual Phone #: ###-####
|
BLD15-00884
| BLD-Final | 6/4/2015 | 6/5/2015 | 6/5/2015 10:12:43 AM | A | FAIL |
|
|
James Phone #: ###-####. Remove the occupancy light sensor in the electrical room and provide a light switch as indicated on the approved plans.
|
BLD15-00788
| BLD-Ceiling Grid Inspection | 6/4/2015 | 6/5/2015 | 6/5/2015 9:54:54 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton. Ok pend. mech.
|
BLD15-00383
| BLD-Framing/Rough-in | 6/2/2015 | 6/5/2015 | 6/5/2015 9:29:05 AM | A | PASS |
|
|
Rich Phone #: ###-####. Reviewed RFI and reinspected SW exterior facade wall. Ok to insulate. Also inspected reinstallation of existing insulation at parapet. Work in progress on west parapet.
|
BLD15-00152
| BLD-Final | 6/4/2015 | 6/5/2015 | 6/5/2015 9:05:14 AM | A | FAIL |
|
|
Dan Phone #: ###-####. Provide the required energy cert. and post. Provide the blower door test result or the 3rd party airseal inspection report and post. 20 min. door to residence from garage? Correction notice was posted.
|