BLD15-00376
| FIRE-Final Inspection | 6/4/2015 | 6/5/2015 | 6/5/2015 3:50:52 PM | P | PASS |
|
|
Life safety pass.
|
FIR15-00234
| INSP-Final Inspection | 6/3/2015 | 6/5/2015 | 6/5/2015 3:49:33 PM | P | PASS |
|
|
Functional test pass. Scope of work complete. Permit finaled.
|
FIR14-00839
| INSP-Sprinkler Rough-in | 6/5/2015 | 6/5/2015 | 6/5/2015 1:52:22 PM | P | PASS |
|
|
Rough-in of grid ceiling areas OK to cover. One sprinkler head overspaced in front office (south west of main door). Needs to be adjusted left to the adjacent 2x2 grid per drawing..
|
GCB14-00099
| FIRE-Sprinkler Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 9:01:39 AM | A | DONE |
|
|
Completed 6/4/15 for sprinkler permit.
|
BLD15-00787
| FIRE-Final Inspection | 6/4/2015 | 6/5/2015 | 6/5/2015 12:00:00 AM | P | FAIL |
|
|
Fire sprinkler modficiations need to be performed and completed under FIR15-00226; Visual indicator for duct smoke detection needs to be repaired.
|