BLD15-01503
| FIRE-Final Inspection | 6/5/2015 | 6/5/2015 | 6/5/2015 1:30:11 PM | P | PASS |
|
|
Fire/Life-Safety inspection for office TI - PASSED NOTE: Bldg. Dept. permit card signed off. TW
|
FIR15-00385
| INSP-Final Inspection | 6/5/2015 | 6/5/2015 | 6/5/2015 1:29:05 PM | P | PASS |
|
|
Fire alarm TI inspection - PASSED
|
FIR15-00410
| INSP-Final Inspection | 6/5/2015 | 6/5/2015 | 6/5/2015 1:28:05 PM | P | PASS |
|
|
Fire sprinkler TI inspection - PASSED
|
FIR15-00096
| INSP-Sprinkler Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 12:33:19 PM | A | PART |
|
|
4th floor east side unit inspections for insulation prior to sheetrock, including all units from 401 thru 420, except 419, which was not ready.
|