ELE18-00686
| Final | 6/5/2018 | 6/5/2018 | 6/5/2018 2:00:18 PM | P | PASS |
|
|
Homeowner should be there Phone #: ###-#### Inspection requested via web by Troy Cobb...ok to final
|
ELE18-01087
| Final | 6/4/2018 | 6/5/2018 | 6/5/2018 1:51:33 PM | P | PASS |
|
|
Power to CNC in 2025 Century Way. Phone #: ###-#### Inspection requested via web by Steve Blackmer...job complete...OCPD and disconnect ok...ok to final
|
ELE18-01087
| Electrical Rough-In | 6/5/2018 | 6/5/2018 | 6/5/2018 1:50:40 PM | P | PASS |
|
|
Power to CNC in 2025 Century Way. Phone #: ###-#### Inspection requested via web by Steve Blackmer...disconnect at service...piped thru building to disconnect at machine...ok
|
ELE18-01389
| Final | 6/5/2018 | 6/5/2018 | 6/5/2018 12:01:18 PM | P | PASS |
|
|
Old location is 10353 Fairview Phone #: ###-#### Inspection requested via web by Steve VanWinkle...no corrections needed...inspected wrong address for previous location of sign...ok to final permit
|
ELE18-01719
| Conference | 6/4/2018 | 6/5/2018 | 6/5/2018 11:19:44 AM | A | PASS |
|
|
Please call 30min before dropping by. Phone #: ###-#### Inspection requested via web by Lee Coulson...discussed wiring of basement...living rm, bathroom, and 2 bedrooms...using existing circuits...placing arc fault on one circuit to satisfy requirement for bedroom...pamphlet given...homeowner competent in work
|
ELE18-01894
| Rough-In Permanent Service | 6/4/2018 | 6/5/2018 | 6/5/2018 9:19:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn....rough ok to cover...p/s u/g new ok
|
ELE18-00810
| Final | 6/4/2018 | 6/5/2018 | 6/5/2018 8:54:00 AM | A | FAIL |
|
|
should be open Phone #: ###-#### Inspection requested via web by Brad Baker... 1. bath instahot needs to be a 30A circuit per manufacturers rating...110.3 2. panel labelling needs completed...408.4 3. outlets within 6' of sink shall have GFCI protection...breakroom future sink..210.8(B)(5) 4. west wall GFCI has no power...unlabelled circuit in panel??
|