Inspections for the day of: Tuesday, June 5, 2018.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM17-03536 Final6/5/20186/5/20186/5/2018 3:27:26 PMPPASS
PLM17-03536 PLM-Aging Inspection6/5/20186/5/20186/5/2018 3:27:04 PM PASS
PLM18-02331 Final6/5/20186/5/20186/5/2018 3:03:16 PMPPASS
Please call Ruth ###-#### for access. Thank you! Phone #: ###-#### Inspection requested via web by Aaron Alandt
PLM18-02258 Water Heater Final6/4/20186/5/20186/5/2018 2:47:23 PMPPASS
Homeowner wanted a water sensor in the pan verses piping the pan at her front door.
PLM18-02015 Pressure Test6/5/20186/5/20186/5/2018 2:25:29 PMPPASS
Pressure test on existing main trunk and branches for Fred Meyer''s gas supply. Phone #: ###-#### Inspection requested via web by Jason Brashears. 60# ok main line
PLM18-02302 Plumbing Rough-in6/4/20186/5/20186/5/2018 1:47:58 PMPPASS
Please call before heading out Cory @2086156557 or Amanda @ 2086156545 Phone #: ###-#### Inspection requested via web by Cory Ogden
PLM18-01488 Final6/5/20186/5/20186/5/2018 11:49:44 AMPFAIL
1. The east bath water closet 3" drain is backgrading.
2. The east bath water closet doesn't flush.
3. The venting doesn't meet the required cross secitional area.
4. Label the ball valve feeding the exiting line. What does it feed?
PLM18-02146 Final6/1/20186/5/20186/5/2018 10:58:49 AMAPASS
please call when you are on the way customers name is Patrick ###-#### Phone #: ###-#### Inspection requested via web by Marisa Hone
PLM18-01820 Plumbing Rough-in6/4/20186/5/20186/5/2018 10:38:04 AMAPART
RYAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER.
Mop sink ok
PLM18-02309 Water and/or Sewer6/4/20186/5/20186/5/2018 10:24:58 AMAPASS
Please call Brian ###-#### with questions. Thank you, Phone #: ###-#### Inspection requested via web by Jennifer Alcala
PLM18-02323 Water and/or Sewer6/5/20186/5/20186/5/2018 10:12:15 AMAPASS
Phone #: ###-#### Inspection requested via web by matt ford
PLM18-02323 DOC - Permit Finaled6/5/20186/5/20186/5/2018 10:12:04 AMPPASS
PLM18-01488 Final6/4/20186/5/20186/5/2018 9:50:48 AMANH
Phone #: ###-#### Inspection requested via web by Nicholas Paige. no access locked gates
PLM18-02312 Sprinkler (Final)6/4/20186/5/20186/5/2018 9:32:27 AMAFAIL
Backflow Phone #: ###-#### Inspection requested via web by Brett Rowland.
1. Expose the connection to the water service and valves
2. Install a union within 12" of the PVB.
PLM18-02311 Sprinkler (Final)6/4/20186/5/20186/5/2018 9:31:12 AMAFAIL
Backflow Phone #: ###-#### Inspection requested via web by Brett Rowland.
Insatll a union with-in 12" of the PVB per ISPC
PLM17-02675 PLM-Aging Inspection6/5/20186/5/20186/5/2018 8:53:17 AM PASS
PLM17-02675 DOC - Permit Expired6/5/20186/5/20186/5/2018 8:53:04 AMPPASS
no repsonse
PLM17-02696 PLM-Aging Inspection6/5/20186/5/20186/5/2018 8:51:12 AM PASS
PLM17-02696 DOC - Permit Finaled6/5/20186/5/20186/5/2018 8:50:53 AMPPASS
PLM17-02673 PLM-Aging Inspection6/5/20186/5/20186/5/2018 8:49:00 AM PEND
PLM18-01680 Final6/4/20186/5/20186/5/2018 8:48:25 AMAPASS
FIRST AM PLEASE Phone #: ###-#### Inspection requested via web by Chris Field