ELE19-00587
| Final | 6/5/2019 | 6/5/2019 | 6/5/2019 2:16:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack... corrections made ok to final
|
ELE19-01989
| Permanent Service | 6/4/2019 | 6/5/2019 | 6/5/2019 2:10:30 PM | P | PASS |
|
|
Installed second ground rod, intersystem bonding bar, and bonded hot and cold on water heater. Door code is 2730 Phone #: ###-#### Inspection requested via web by Dylan Pierce... corrections made P/s reconnect ok
|
ELE18-01718
| Final | 6/4/2019 | 6/5/2019 | 6/5/2019 1:58:37 PM | P | NR |
|
|
Final inspection please. Thank you! Have a bless day! Phone #: ###-#### Inspection requested via web by Kyle Lott... electrical not complete contractor notified and discussed issues MIS permit pulled for exterior lighting being done without a permit-work excluded out of this permit and Lott Electric is not responsible. General has been made aware of.
|
ELE19-02059
| Rough-In Permanent Service | 6/5/2019 | 6/5/2019 | 6/5/2019 12:43:29 PM | P | PASS |
|
|
Please let me know when inspection is complete so I can call Idaho Power to reconnect power ###-#### Kathy @Eco Electric Phone #: ###-#### Inspection requested via web by Eric Schroeder... 100A panel replaced existing 100A panel additional ground rod added existing 50A hot tub circuit installed with no inspection previous to permit for service change pulled requiring electrician remove hot tub circuit out of panel and permit will not be finaled until hot tub circuit is completely removed or a service upgrade to minimum 200A is done house is being rented at this time p/s u/g reconnect ok
|
ELE16-00910
| ELE-Aging Inspection | 6/5/2019 | 6/5/2019 | 6/5/2019 11:51:17 AM | | PASS |
|
|
message left on contacts voicemail requesting a final be scheduled or an extension be requested 6/5/19 11:50 AM
|
ELE15-02845
| DOC - Permit Expired | 6/5/2019 | 6/5/2019 | 6/5/2019 11:38:34 AM | P | PASS |
|
|
work was done by others no work done on permit for over 180 days
|
ELE19-01731
| Final | 6/4/2019 | 6/5/2019 | 6/5/2019 11:18:13 AM | A | PASS |
|
|
please call David prior he is in Meridian and will need a little time to drive over Phone #: ###-#### Inspection requested via web by Ashley Rasmussen....
informed installer future installs shall have rough inspections or a reinspection fee will be applied Labelling, disconnect, and OCPD ok
|
ELE19-01731
| Electrical Rough-In | 6/4/2019 | 6/5/2019 | 6/5/2019 11:16:03 AM | A | PASS |
|
|
please call David prior he is in Meridian and will need a little time to drive over Phone #: ###-#### Inspection requested via web by Ashley Rasmussen.... UL listed equipment verified
|
ELE19-02042
| Electrical Rough-In | 6/4/2019 | 6/5/2019 | 6/5/2019 10:29:26 AM | A | PASS |
|
|
Undergound inspection. Phone #: ###-#### Inspection requested via web by Brad Girard... pipe ok to cover circuit shall be GFCI protected with breaker lockout inside panel
|
ELE18-03154
| Final | 6/4/2019 | 6/5/2019 | 6/5/2019 9:32:52 AM | A | PASS |
|
|
Any questions please call Louis @ ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller... corrections made...ok to final
|
ELE19-01890
| Electrical Rough-In | 6/4/2019 | 6/5/2019 | 6/5/2019 8:58:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...2nd floor bathrooms full rough cover
|
ELE19-00675
| Final | 6/4/2019 | 6/5/2019 | 6/5/2019 8:15:46 AM | A | PASS |
|
|
Power is on and home is powered up please contact when done so I get the trench filled in Phone #: ###-#### Inspection requested via web by Thomas wilson...ok to final
|