MEC96-01037
| INSP - Framing/ Rough-in | 6/6/1996 | 6/6/1996 | 6/6/1996 12:00:00 AM | | PASS |
|
|
/ / 337 - RGHN-OK ROUGH IN
|
MEC96-01607
| INSP - Retro Fit (check note) | 6/5/1996 | 6/6/1996 | 6/6/1996 12:00:00 AM | A | NR |
|
|
06/05/96 337 - FURNACE, WATER HEATER, GAS LINE. JOB WILL BE READY IN ABOUT 3 WEEKS
|
MEC96-01609
| INSP - Retro Fit (check note) | 6/5/1996 | 6/6/1996 | 6/6/1996 12:00:00 AM | A | FAIL |
|
|
06/05/96 337 - W/H GAS TEST CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
MEC95-02294
| INSP - Final | 6/5/1996 | 6/6/1996 | 6/6/1996 12:00:00 AM | A | PASS |
|
|
06/05/96 337 - FNL -OK FINAL
|
MEC95-02294
| INSP - Final | 6/5/1996 | 6/6/1996 | 6/6/1996 12:00:00 AM | A | PASS |
|
|
06/05/96 337 - FNL -OK FINAL
|