BLD00-03157
| BLD-Energy code compliance | 6/5/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | A | PART |
|
|
April ###-#### frame ok for cover 6/6/2001 5:00:47 PM
|
BLD00-02752
| BLD-Wall cover | 6/5/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 13:41:12. Contact: ###-####.ALL ROOMS OK TO COVER & TILE 6/6/2001 11:56:01 AM
|
BLD01-01168
| BLD-Framing/Rough-in | 6/5/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | A | PASS |
|
|
Charlie ###-#### reinspection; c/n ok 6/6/2001 4:24:28 PM
|
BLD99-03148
| BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 6/6/2001 8:39:15 AM w/ en Howell re c/n...need canopies at ext. hdwe at ext doors, etc. for final
|
BLD98-03343
| BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | A | CANC |
|
|
Added by Inspector: 340 On 6/6/2001 11:09:54 AM rec'd eng's letter
|
BLD98-01409
| BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 6/6/2001 11:10:49 AM rec'd eng's & spec insp's letters
|
MEC00-04158
| Final | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/06/2001 at 11:10:43. Contact: ###-####...sent to Dix. 6/6/2001 11:22:06 AM
|
BLD98-03661
| BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 6/6/2001 3:53:49 PM w/ Jordan Wilcomb re final
|
BLD01-01168
| BLD-Energy code compliance | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | CANC |
|
|
Added by Inspector: 340 On 6/6/2001 4:24:13 PM ok to cover
|
BLD01-01254
| BLD-Framing/Rough-in | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | PART |
|
|
###-#### 3rd floor, walls okpend plbg demo, fill floor drain, wrap landing w/ gypsum 6/6/2001 2:20:04 PM
|
BLD01-00379
| BLD-Foundation | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | PART |
|
|
Chris ###-####...elev sump; recall for front wall & column when steel in place 6/6/2001 3:38:46 PM
|
BLD01-00727
| BLD-Framing/Rough-in | 6/6/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | PASS |
|
|
Chuck ###-####...ok to cover walls 6/6/2001 1:47:42 PM
|
BLD00-00771
| BLD-Final | 6/5/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | FAIL |
|
|
mike ###-####; need other perm. finals, ok for t/o, card to contractor. 6/6/2001 3:17:15 PM
|
BLD01-01122
| BLD-Framing/Rough-in | 6/5/2001 | 6/6/2001 | 6/6/2001 12:00:00 AM | P | PART |
|
|
###-####, framing added, ok to sheath & roof 6/6/2001 4:51:00 PM
|