Inspections for the day of: Wednesday, June 6, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00561 BLD-Aging Inspection6/6/20016/6/20016/6/2001 12:00:00 AM PART
exp 9/3/01. 1/6/2002 1:02:01 PM
BLD00-02822 BLD-Framing/Rough-in6/5/20016/6/20016/6/2001 12:00:00 AMAFAIL
John ###-####
BLD01-01385 BLD-Final6/5/20016/6/20016/6/2001 12:00:00 AMAPASS
###-####
BLD01-00366 BLD-Framing/Rough-in6/5/20016/6/20016/6/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/05/2001 at 13:16:02. Contact: . small wall at front area communication room. 1/6/2002 12:39:32 PM
BLD01-00511 BLD-Foundation6/5/20016/6/20016/6/2001 12:00:00 AMAPART
###-####
BLD01-00583 BLD-Framing/Rough-in6/6/20016/6/20016/6/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/06/2001 at 08:23:30. Contact: ###-####. c/n posted again by 316. 1/6/2002 5:14:56 PM
BLD01-00220 BLD-Footing6/6/20016/6/20016/6/2001 12:00:00 AMPPART
cory ###-#### s-i required insp. 1/6/2002 5:14:33 PM
BLD01-01053 BLD-Framing/Rough-in6/6/20016/6/20016/6/2001 12:00:00 AMPFAIL
Brian ###-#### brace tops of walls and install lighting for grid insp c/n. 1/6/2002 4:12:13 PM
BLD00-02811 BLD-Framing/Rough-in6/6/20016/6/20016/6/2001 12:00:00 AMPPART
shear john ###-#### 1/6/2002 5:14:08 PMint drywall. 1/6/2002 5:14:18 PM
BLD01-01048 BLD-Framing/Rough-in6/6/20016/6/20016/6/2001 12:00:00 AMPFAIL
###-#### c/n hd. 1/6/2002 5:10:56 PM
BLD00-03499 BLD-Conference6/6/20016/6/20016/6/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/06/2001 at 11:21:59. Contact: ###-####. questioned exiting out of room which houses pait booth, needs an exit door,wanted to use roll up. 1/6/2002 1:45:01 PM