Inspections for the day of: Thursday, June 6, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02848 BLD-Framing/Rough-in3/13/20026/6/20026/6/2002 12:00:00 AMANR
###-#### or ###-#### Les c/n stands. 6/6/2002 12:06:39 PM
BLD02-00426 BLD-Framing/Rough-in6/5/20026/6/20026/6/2002 12:00:00 AMAPART
fr insp- gary ###-#### brace pannel nailling ok for exterior cover. 6/6/2002 9:25:01 AM
BLD02-00321 BLD-Energy code compliance6/5/20026/6/20026/6/2002 12:00:00 AMAFAIL
1. b vent must maintane vappor barrior and insulation papper min. 1 inch clearance

2. window above garage not insulated around rough framing to window frame.
MEC02-01518 Pressure Test6/6/20026/6/20026/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/06/2002 at 09:17:38. Contact: ###-####.
MEC02-01234 Final6/6/20026/6/20026/6/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/06/2002 at 09:19:12. Contact: ###-####. maintane 6 inches min. from air filter from single wall flue duct. 6/6/2002 3:42:11 PM
BLD02-00321 BLD-Energy code compliance6/6/20026/6/20026/6/2002 12:00:00 AMPPASS
JUSTON ###-#### c/n made ok. 6/6/2002 4:12:20 PM
MEC02-00674 Final6/5/20026/6/20026/6/2002 12:00:00 AMPFAIL
###-#### keys above door cannot access under floor. 6/6/2002 4:30:00 PM
MEC02-00675 Final6/5/20026/6/20026/6/2002 12:00:00 AMPFAIL
###-#### keys above doorcannot access under floor. 6/6/2002 4:29:26 PM
BLD02-01243 BLD-Framing/Rough-in6/5/20026/6/20026/6/2002 12:00:00 AMPNR
###-#### ROBERT conf. only. 6/6/2002 5:05:53 PM