PLM02-01633
| Sprinkler (Final) | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | A | PASS |
|
|
BRAD ###-####
|
PLM02-01589
| Sprinkler (Final) | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | A | PASS |
|
|
|
PLM02-00475
| Final | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 09:56:57. Contact: ###-####. ACCESS DST ON LOCK BOX IN BACK
|
PLM02-00584
| Water and/or Sewer | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 08:07:04. Contact: ###-####. no work on this permit gz 6/7/2002 7:50:06 AM
|
PLM02-01502
| Water and/or Sewer | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 08:16:35. Contact: ###-####.
|