ELE02-01238
| Electrical Rough-In | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | A | FAIL |
|
|
ben ###-#### 300-4 protection/362-21 bends in ent/362-30 secure with in 3 ft/314-16 box fill/314 17 unused openings 6/6/2002 10:26:40 AM
|
ELE02-01043
| Final | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 14:17:01. Contact: ###-####.
|
ELE02-01691
| Final | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PASS |
|
|
fn ###-####- berek for ser p/s ug r called i.p. 6/6/2002 2:47:02 PM
|
ELE02-01568
| Rough-In Permanent Service | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PASS |
|
|
###-#### p/s ug n ok 6/6/2002 4:00:08 PM
|
ELE02-00927
| Final | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PASS |
|
|
vivian ###-#### re-insp
|
ELE02-01700
| Electrical Rough-In | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PASS |
|
|
emmett- ###-#### r/i r/i kitchen 6/6/2002 2:24:03 PM
|