BLD02-01051
| BLD-Framing/Rough-in | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 14:21:17. Contact: ###-####.. need truss detail , electrical has been approved able to verify now as computer back up. wrote this on the job card on site. 6/6/2002 11:32:01 AM
|
BLD02-01133
| BLD-Foundation | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | A | PART |
|
|
###-#### CAL appears ok no plans early start. 6/6/2002 10:41:02 AM
|
BLD02-00343
| BLD-Final | 6/4/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | A | FAIL |
|
|
ROWENA ###-#### c/n posted. 6/6/2002 11:10:57 AM
|
BLD01-00729
| BLD-Framing/Rough-in | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 6/5/2002 1:11:25 PM complete front lobby and main restrooms. ceiling. 6/6/2002 3:57:15 PM
|
BLD01-02798
| BLD-Final | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PART |
|
|
###-####-jeff. Ok temp oc , only item left is office door hardware. 6/6/2002 3:15:53 PM
|
BLD02-00484
| BLD-Framing/Rough-in | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | FAIL |
|
|
###-####needs 2 hds at shear panel. 6/6/2002 5:46:22 PM
|
BLD01-02802
| BLD-Final | 6/5/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 17:41:02. Contact: ###-####.. needs 4 hold downs only installed 2. Wrote this on existing c/n. 6/6/2002 4:15:29 PM 6/6/2002 4:15:49 PM
|
BLD02-00503
| BLD-Final | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PASS |
|
|
###-#### bruce Ok for a permanent oc 6/7/2002 9:54:19 AM 6/7/2002 10:00:39 AM
|
BLD02-01271
| BLD-Footing | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PART |
|
|
DAVE ###-#### no aproved plans work in progress. 6/6/2002 4:24:10 PM
|
BLD02-01207
| BLD-Footing | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PART |
|
|
ft insp logan ###-####
|
BLD02-00704
| BLD-Final | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | FAIL |
|
|
DALE ###-#### . needs smoke detectors. 6/6/2002 5:18:23 PM
|
BLD02-01127
| BLD-Conference | 6/6/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 407 On 6/6/2002 4:31:49 PM
|
MEC02-01194
| Final | 6/7/2002 | 6/6/2002 | 6/6/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 407 On 6/7/2002 8:00:57 AM
|