PLM03-01636
| Plumbing Rough-in | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | A | NR |
|
|
###-#### john
|
PLM03-01502
| Water and/or Sewer | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | A | PART |
|
|
One water line to 3335 is ok but contractor will have to replace sewer crossings of all water lines for project with schedule 40 dwv for 10 feet on each side of water lines. 6/6/2003 12:05:42 PM 6/6/2003 12:08:24 PM
|
PLM03-00282
| Final | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/6/2003 at 7:40:42 AM. Contact: ###-####.
|
PLM03-01652
| Water and/or Sewer | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
SWR LINE PAM ###-####
|
PLM03-01659
| Sprinkler (Final) | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
###-#### charles
|
PLM03-01328
| Plumbing Rough-in | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
mark drains; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
This was a ground work 6/6/2003 4:01:30 PM
|
PLM03-01231
| Final | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/6/2003 at 10:48:29 AM. Contact: ###-####.
|
PLM03-01636
| Plumbing Rough-in | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
water gauges holding now 6/9/2003 9:12:48 AM
|
PLM03-01502
| Water and/or Sewer | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
2nd water line ok 6/9/2003 9:12:06 AM
|