ELE03-01647
| Final | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | A | PASS |
|
|
We ran a new 20amp 230volt 3wire ckt. out the back of the panel and along the outside of the wall in EMT to a single recept. in a bell box with a bubble cover.; Phone #: ###-####
|
ELE03-01658
| Final | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell 110-3 listing and labeling/two screws for recpt/cords for fix wiring 6/6/2003 12:04:54 PM
|
ELE03-01547
| Electrical Rough-In | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | A | PASS |
|
|
###-#### call to meet there
|
ELE03-01051
| Final | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
###-####
|
ELE03-01638
| Rough-In Permanent Service | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
###-#### p/s ug n ok 6/6/2003 3:53:45 PM
|
ELE03-00471
| Electrical Rough-In | 6/5/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 10:53:45 PM. Contact: ###-####. r/i ok for cover 6/6/2003 3:00:22 PM
|
ELE03-01425
| Electrical Rough-In | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/6/2003 at 9:17:40 AM. Contact: ###-####.
|
ELE03-01169
| Final | 6/6/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 6/6/2003 at 9:45:29 AM. Contact: ###-####.
|
ELE03-00679
| Electrical Rough-In | 6/4/2003 | 6/6/2003 | 6/6/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/4/2003 at 12:00:02 PM. Contact: ###-####. p/s ug r ok 6/6/2003 1:43:52 PM
|